Penton Systems

Penton Systems / Tools / Market analysis

Market analysis

Hardware got expensive. Good engineering did not.

Memory shortages, long lead times and soaring prices are changing what makes sense to buy. Here is what the data says, where we see an opening, and a calculator that tells you the truth, including when new hardware wins.

01 / 05
What the data says

The squeeze is real, and it is measurable

Three signals from analysts, the IT asset disposition market and resellers. Each figure is as reported by the named source.

  1. 80 to 90%

    Memory prices jumped

    Counterpoint reported memory prices rising 80 to 90 percent quarter over quarter in Q1 2026, and trade press reported analysts expecting server memory prices to keep climbing through 2026 (sources below).

    Reported by analysts
  2. 2.5×

    Used servers got valuable

    The Sage Sustainable Electronics ITAD benchmark found server resale values in 2025 at roughly 2.5 times their seven-year average, tied to constrained standard memory supply.

    ITAD benchmark
  3. 32 to 40 wk

    Lead times stretched

    Resellers report memory component lead times of 32 to 40 weeks in 2026, with enterprise server lead times lengthening every quarter. Treat reseller figures as indicative.

    Reseller reports

Price moves differ by component, generation and date, and most public figures are forecasts or contract prices. We do not publish a single headline multiplier because no verified one exists across all hardware. Sources are listed at the bottom of this page.

02 / 05
Where we see the opening

Four gaps worth filling

This is our own assessment of the market, not sourced data.

  1. 01

    Upgrade the fleet you already own

    When new memory costs double, a tested, correctly planned memory and storage upgrade on an existing PowerEdge often beats replacing the whole server. Most buyers lack a reliable way to size it. Our upgrade planner exists for exactly that.

  2. 02

    Edge computing where servers are rare

    Vessels, hangars and remote sites need real compute but cannot afford new-hardware prices or cloud dependence. Refurbished enterprise servers in shock-isolated racks, with three independent WANs, are a strong fit. See connectivity.

  3. 03

    Private AI on owned hardware

    Small operators want local language models for privacy and predictable cost, but new GPU servers are out of reach. Right-sizing a model to one job, and choosing capable platforms, narrows the gap. Hardware choices are validated per configuration.

  4. 04

    Honest total-cost advice

    Older servers draw more power and carry more support risk. Vendors rarely say so. A buyer who gets the whole cost picture, including power and spares, trusts the seller who showed it. The calculator below does exactly that.

03 / 05
Free calculator

Refurbished versus new, with power included

Enter the quotes you actually have. The values below are placeholders for illustration, not market prices.

This calculator needs JavaScript. The formula: total = hardware (+ spares reserve) + watts × cooling multiplier × 8.76 × electricity rate × quantity × years.

04 / 05
Straight talk

When refurbished is the wrong call

  1. 01

    Power-hungry, always-on loads

    If a server runs flat out all year and electricity is expensive, an efficient newer machine can win. Run the numbers first.

  2. 02

    Platforms near end of support

    Older generations stop receiving firmware and driver updates. We say so up front and match the platform to the job.

  3. 03

    Harsh environments without protection

    Shipboard or industrial use needs shock-isolated, environmentally appropriate racks and enclosures. Standards for shipboard equipment exist, and approvals for specific uses must come from the right bodies. We design around them and do not claim approvals we do not hold.

05 / 05
Led by Scott Penton

Why this analysis is on our site

Scott Penton built Penton Systems on a simple belief from running operations: reliability is a design decision, and good decisions need honest numbers. This page is the numbers.

Sources

  1. Network World: server memory prices could double by 2026
  2. Counterpoint via GamesBeat: memory chip prices soar up to 90% in Q1 2026
  3. The Register: AI chip frenzy to wallop DRAM prices
  4. Resource Recycling: server resale values surge (Sage benchmark)
  5. Covenco: enterprise hardware lead times 2026
  6. Sourceability: the DDR4 paradox
  7. nVent Schroff: naval electronics and rugged application challenges

Several sources are vendor or analyst commentary. Figures are as reported and may have changed since publication.

Next step

Want your numbers checked?

Send your current quote and workload. We will run the comparison honestly, even if the answer is to buy new.

Need a refurbished server? Need a private lab VPS?Talk to the engineers who build, test and run the lab in Orlando.